BOX 319 3 folders with architects drawings and correspondence. Folder 3 has colour photographs. 1990
BOX 144 Correspondence including ' Second jubilee history of St Johns Church of England Diamond Creek 1867 - 1967' by Donald Cordner 44p and 'Centenary thanksgiving service...29 October 1967' 'History of the Anglican Parish of Diamond Creek with St Helena and Yarrambat 1867 - 1997' by Jock Ryan and 'Dedication and opening of St Johns Anglican Church Diamond Creek' 2011 (2016-12)
BOX 1148 2019-11 Correspondence
BOX 1850 Correspondence: 1923 - 1985
BOX 1902 Maps/plans : 1979 - 1996
BOX 1918 (2024-14) Pizzey Memorial Endowment - In 1918, 1000 shares in G. Pizzey and Son Ltd. were handed over for the purpose of erecting a Sunday School, to be known as the Pizzey Memorial. In 1921 the shares were converted into cash, the Sunday School built and the balance of the proceeds lodged with the Diocesan Trust Fund as an Endowment for the parish. This indenture September 19 1917 between the Church of England Trusts Corporation and Alfred Eliel Pizzey estate of the late George Martin Pizzey deceased are desirous that a Sunday School building in connection with the Church of England should be erected at Diamond Creek in memory of the said George Martin Pizzey.
BOX 2005
Correspondence: 1891 - 1945
Map cabinet 1 drawer 1 (Drawings donated by Keith Butler)
Architects' Drawings and Plans
Stage 2 Development (September 91) Original Drawing A1B - Site plan and Roof plan.
Stage 2 Development (September 91) A2B - Floor Plan.
Stage 2 Development (September 91) A3A - Elevation and Section.
Stage 2 Development (September 91) A4A - Detail Plan.
Stage 2 Development (September 91) A5A - Detail Section.
Stage 2 Development (October 91) A6A - Detail Section.
Stage 2 Development (September 91) A7A - Detail Section.
Stage 2 Development (September 91) A8A - Detail Section.
Stage 2 Development (September 91) A9C - Reflected Ceiling Plans and Electrical Plans.
Stage 2 Development (October 91) SE1 - Slab and Footing Plan and Details.
Stage 2 Development (October 91) SE2A.
Stage 2 Development (October 91) SE3 - Roof Framing Details.
Stage 2 Development (September 91) Copies of A1B, A2B, A3A, A4A, A5A, A6A, A7A, A8A, A9C, SE1, SE2A, SE3.
Stage 2 Development (September 91) Proposed Baptistry.
Stage 2 Development (September 91) Old Church/New Church.
Stage 1 Development (September 91) A513- A1 Site Plan.
(April 1988) 8513 - A2 Floor Plan Electrical and Reflected Ceiling Plan.
(April 1988) 8513 - Elevation and Section.
(April 1988) 8513 - A3 - Detail Sections.
(April 1988) 8513 - A4 - Joinery and Toilet Details.
(April 1988) Raft Slab and Foundation Plan 731, S1 - S5.
(July 1987) Possible Redevelopment Plans 8513 -11.
(October 1987) Possible Redevelopment Plans 8513 - 9.
(October 1987) Possible Redevelopment Plans 8513 - 10.
(Revised November 1989; August 1991) Car Park Elevation 8513 - 7C.
(Revised November 1989; August 1991) 8513 - 8D Down-Hill Elevation and West Elevation. Possible Total Development Plan.
(Revised November 1989; August 1991) 8513 - 5A.
(July 1987) 8513 - 5B Main Street Elevation and Completed Master Plan.
(Amended November 1989 - June 1990) 8513 - 6E Total Redevelopment Site Plan.
(Amended November 1989 - June 1990) 8513- 6G Possible Development Site Plan.